You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 24 Next »

Introduction

The Technology Stack Working Group (TSWG) specifies requirements, specifications, and test suites for the technical architecture of the ToIP stack. For an overview of the ToIP stack, see the Introduction to ToIP white paper.

Scope

Define (directly or by reference) the technical standards, test suites, and interoperability certification standards for the Trust over IP architecture stack consistent with the Design Principles for the ToIP Stack.

Task Forces

Much of the work on deliverables of the TSWG is performed my self-organizing Task Forces (TFs). Following are the currently active TFs and their current leads. See their home pages for their meeting schedules.

Meetings

The TSWG currently holds meetings every two weeks. See the TSWG Meeting Page for the schedule of meetings along with agendas, notes and recordings from all meetings.

Deliverables

The table below lists all TSWG deliverables that have been approved to move beyond Pre-Draft status. Bold = current. Non-bold = future. WG members are welcome to follow the links to contribute, either by joining the responsible Task Force (TF) or contributing directly to a deliverable document.

Name of DeliverableDeliverable TypeLink to DeliverableTask ForceStatus
Principles of SSIRecommendationPDFCompletedToIP Approved Deliverable

Design Principles for the ToIP Stack

RecommendationGoogle Document

ToIP Stack Design Principles TF

Working Group Approved Deliverable (2021-11-15)
ACDC SpecificationSpecificationSee ACDC TF home pageACDC TFDraft Deliverable
ToIP Technology Architecture SpecificationSpecificationGoogle DocumentToIP Technology Architecture TFDraft Deliverable





Other potential deliverables discussed by TSWG members:

Chairs / Leads

How to join

You can join this WG by signing up for the Foundation mailing list at lists.trustoverip.org. Our mailing list is technology-stack-wg@lists.trustoverip.org.

Members as well as observers are welcome (with the important caveat below).

Participation

For the protection of all Members, participation in working groups, meetings and events is limited to members, including their employees, of the Trust over IP Foundation who have signed the membership documents and thus agreed to the intellectual property rules governing participation. If you or your employer are not a member of ToIP, you may not participate in meetings by verbal contribution or otherwise take any action beyond observing.  To join ToIP and be able to contribute, please fill out the light weight membership application on our website here

Intellectual Property Rights (Copyright, Patent, Source Code)

The WG inherits the IPR terms from the JDF Charter. These include:


  • No labels