Kick-off Meeting (Will repeat info from 2020-06-01)

08, June 2020  — 8:30AM IST, 11 AM Singapore, Noon JST, 8PM US PT, 11PM US ET

Send an email to technical-stack-wg@lists.trustoverip.org to request a calendar invite (you can subscribe to the mailing list at lists.trustoverip.org).

Agenda

Guiding Goal: Organize the working group.

  • Welcome from the conveners (Dan, Matt—5 min)
  • Introductions (WG, 15 min)
  • Mission and scope of this WG (Matt — 10 min)
  • Potential initial work items (Dan — 15 min)
  • Logistics (Matt—10 min)
    1. Mailing list
    2. Wiki
    3. Github repo structure (repository of best practices)
    4. Task Forces
    5. Chairs
    6. Meeting schedule

The meeting presentation is attached to this page.

Meeting Notes

Recording:


Participants:

Abilash Soundararajan: Banglore: Truthshare.tech. 

Dan Bachenheimer

Matt Davies

Adrian Gropper

Eric Drury

Vinod Panicker, Kochi, India, Wipro.

Ajay Jadhav, Pune, India (AyanWorks)


Additional Desired Outcomes:

Vinod: Propose starting APAC 1 hour later in APAC.

Vinod: How do pull requests become merged into mainlines?

Vinod: Are there any specific maintainers who can validate PR's?


Abilash: Is there a top-level white paper that is being written, and, if so, how to contribute?


Messages to mailing list to be sent:

Call for volunteers (Dan)

Call for term duration (Matt)

Call for APAC start time preference. (Dan)


Chair Volunteers (3 max)

No new volunteers.