per TSWG meeting on 21SEP2020, TASK:

Establish Task Force for a Layer 1 Spec Deliverable 


Task Force Charter - a basic what's in/out for scope:


Technical Interoperability definition for the interactions between Layer 2 and Layer 1

Focus should be on:

  • REQUIRED
    • CRUD for:
      • DID - Anchoring DIDs with key rotation (includes possible KERI support)
      • DID Document
      • anything else?
      • Sovrin/Indy:
        • CredDefs
        • SchemaDefs
        • what else?
    • Reference to Governance Framework that explains:
      • Adherence to main ToIP Principles <NEED LINK>
      • <TODO: flesh out various principles>
  • OPTIONAL(Limited list of OTHER items):
    • DID Document serving (CRUD)
    • do we need anything as granular as getNodes() / getConsensusStatus() / getObservers()...
    • How should the Layer 1/2 spec tie in with Layer 1 governance frameworks (coordinate with GSWG)


Task Force Scope:

  • Define what a Layer 1 Specification MUST and SHOULD include.
  • Stick to the bare minimum. If a system can do various operations normally at a higher-layer, or if tailoring is required at a higher layer, it may belong there.
  • No labels