8AM PT, 11AM ET, 16:00 UK, 17:00 CET

APAC xxxxx2021 - 0500h ET / 1530h India

See the ToIP Calendar for meeting info. Send email to technical-stack-wg@lists.trustoverip.org to request a calendar invite (you can subscribe to the mailing list at lists.trustoverip.org).

Attendees

RECORDING 

Goals

Agenda Items

TimeItemWhoNotes
5 min

Welcome
Antitrust Policy Notice
Introductions

Chairs


2 mins

Review / Approve minutes from last meeting ()

Chairs
  • Approval: By Consensus
5 mins

Announcements

All
30 minsGeneral topics - see Notes section belowAll
5 minsTask Force SOS (Scrum of Scrums)TF Leads
5 minsDecision PointsChairs
10 minsOpen Discussion TopicsChairs
10 minsReview Action and Open ItemsChairs

Notes

CLEANUP

Announcement Details

TSWG APAC Interlock

APAC meetings not happening discretely at this time.

Task Force SOS (Scrum of Scrums)

<TODO: DARRELL clean table up - TF Name and the TF Deliverables>

TF NameMissionMembersStatus
Privacy by DesignSubmit a ToIP Design Principles Deliverable.

2021-05-31 ACTION DARRELL - find status (git, Google Doc, etc.) to prepare for CLOSEOUT


Laws of IdentitySubmit a ToIP Design Principles Deliverable.

DRAFT HERE (Google Docs)

2021-05-31 ACTION DARRELL - find status (git, Google Doc, etc.) to prepare for CLOSEOUT

SSI Principles

(DP0031)

Submit community work from Sovrin SUGF TF ad SEGF TF


MOVED to SC for approval - will drop from TF SOS next meeting.

2021-05-31 ACTION DARRELL - find status (git, Google Doc, etc.) to prepare for CLOSEOUT

TSWG 4-Layer Model

Darrell O'Donnell (lead)

<< NEED MORE >>

Top-Down using HL-Aries and HL-Indy (+ other ledgers possibly) as the framework exemplar. The goal is to explain the various 

GOAL: Get something out. EARLY SKELETON DOC

how does this 4-layer support the needs that we see...


Saturn-V TIP Task ForceSubmit a TIP Recommendation  Deliverable.
TSWG GlossaryCollaborate with CTWG on the process and delivery of a TSWG Glossary. RJ Reiser  (lead) 

Glossary is an ongoing effort. Any updates?

"Big 4" should be referencing and be consistent (use terms, introduce new terms if absolutely required).

Foundational RFC Whitepaper Task Force

(WP0010)

RFC 289 Conversion 
Layer 1 (2:1) Interop Spec (TSS0011) Submit a ToIP Specification Deliverable 

Working on a deliverable plan.

Spec outline concepts being discussed. 

Deliverables Repo TSS0011 ready for TF development.

Layer 2 (3:2)  Interop Spec (TSS0012)Submit a ToIP Specification Deliverable

Working on a deliverable plan.

Spec outline concepts being discussed. 

Deliverables Repo TSS0012 ready for TF development.

Layer 3 (4:3) Interop Spec (TSS0013)Submit a ToIP Specification Deliverable

Working on a deliverable plan.

Spec outline concepts being discussed. 

Deliverables Repo TSS0013 ready for TF development.

Decentralization Task Force

(DP0005)

Submit a ToIP Recommendation as a Design Principle.

Daniel Bachenheimer  (Cross Foundation TF Representative)


Dependency for Saturn-V proposal. 

DISCUSS AT 14JUN2021 - being handled elsewhere

W3C Rubric

Dan Gisolfito send a call-for-participation to all ToIP WG members to join DP0005 TF.
Daniel Bachenheimerto coordinate with Jessica Townsendon the leadership of this TF which effectively will be an extension of the UFWG TF mission.


Net result: This TWWG work will be captured as a representative of the TSWG in the proposed TF. 

Technology Stack Task Force


Deliver an approved specification RFC 289 Conversion (TSS0002)

NEED CLARITY Drummond Reed (Create Wiki page) & Darrell O'Donnell

Q1 Deliverable - as part of the "Big 4" documents. 

NEED: 

  • Lead
  • Participants

Start with TSS0001 as beginning.

CHALLENGE - Review TSS0001 to get a grounding in what is required here. 

Content will be extracted from current state of WP0010.

Goal here is to adapt Hyperledger Aries RFC289 into a Tech Spec.

ToIP Stack Design Principles Task Force

(DP0034)

Combined Principles doc for the ToIP Stack. Part of "Big 4" deliverables. 

See Wiki discussion draft as well as the Big 4 description. Please also see WIP Google Doc.

2021-05-31 works continues - should be getting attention soon

RAISE at next (14JUN2021) meeting Drummond Reed

Decision Points

Action items

Open Items

Low priority items that failed to gain volunteers to champion cause.